Drill rig machine
-
600m depth water well drilling rig with mud pump
Function and details about FY600 water well drill rig
FY600 water well drilling rig features: 1. FY600 series water well drilling rig adopts full hydraulic control, the top drive drives the drilling tool to rotate, and the drilling efficiency is high.
2. Using Yuchai 118kw generator, strong power and long service life. Oil pump imported from Italy, 3 oil pumps
3. The overall layout is reasonable, and the traction or all-ground chassis is used for transportation, with good maneuverability.
4. It is very flexible on difficult roads, and can be widely used in hydrological well resource exploration, coalbed methane, shallow shale gas, geothermal and other fields, and can also be used in coal mine gas mining and salvage work.
5. The main shaft of the top-mounted drive head has a large diameter, which is suitable for various construction operations such as mud drilling, air drilling, and air foam drilling, and meets the drilling needs of different formations.
6. The independent heat dissipation dual system adopts hydraulic oil temperature cooling and is equipped with traditional air cooling. long engine life
7. Dual system: 1. Air power system with air compressor 2. Mud pump system with mud pump
FY600 Crawler Water Well Drilling Rig technical specification
Hole diameter
140-350mm (5.5-13.8inch)
Drilling depth(m)
600m
Equipped capacitor(KW)
Yuchai 118Kw
Drill pipe diameter(MM)
102/108/114
Hoisting force of winch(T)
2 ton
The penetration efficiency(m/h)
15-35
One-tine advance length(m)
6.6 m
Rig lifting force(T)
26 ton
Swing torque(N.m)
7500-10000 N.m
Swing speed(rpm)
40-130 rpm
Using air pressure(MAP)
1.7-3.5 (17-35 bar)
Air consumption(m³/min)
17-42 m³/min
BW600/10 Mud pump technical specification
Type Horizontal three cylinder reciprocating single acting piston pump Cylinder diameter (mm) 100 Stroke(mm) 110 Pump speed (times/min) 232 162 109 76 Flow(L/min) 600 415 280 195 Pressure(Mpa) 3.5 5 7.5 10 Power (Kw) 55 Dimension(mm) 1500*890*1230 Weight (kg) 1400 Do you know how to use the water well drilling rig, these precautions need to be taken into account
Water well drilling rig is to deal with water wells, it is mainly drilling water wells and to complete the well tubing, washing and other operations, the operation is very simple, in order to operate more safely, the following for you to introduce the operation of the water well drilling rig when the precautions:
1, the driller must be specially trained, and have a certain amount of work experience can be on the job;
2, the driller must master the operation of the drilling rig and comprehensive maintenance knowledge, and have considerable experience in troubleshooting methods;
3, before loading and transporting the drilling rig, should carry out a full inspection, the drilling rig parts should be complete, no leakage of cable, no damage to the drilling rods, drilling tools and other phenomena;
4, the rig should be loaded firmly, corner or ramp to slow plus steel wire fixed point fixed;
5, into the construction site, the drilling rig drilling tower should be fixed, the drilling field area should be larger than the drilling rig seat, there should be enough safe space around;
6, drilling should be strictly in accordance with the hole position and orientation, angle, hole depth and other construction, rig workers can not be changed without authorization;
7、Check the drill rig when installing the drill pipe to make sure that the drill pipe is not blocked, not bent, and the fillet is not worn out, and the unqualified drill pipe is strictly prohibited to be used;
8、When loading and unloading the drill bit, strictly prevent the pipe wrench from pinching the carbide piece, and strictly prevent flattening the drill bit and core pipe;
9、When installing drill pipes, the second one should be installed after the first one;
10, the use of water drilling, the water supply is not allowed before the start of drilling, water return before pressure drilling, and to ensure that there is sufficient flow, not allowed to drill dry holes, the hole in the rock powder, should increase the amount of water to extend the time of the pump, and effectively punch the hole before stopping drilling;.